La Cañada Flintridge, CA - New Construction

New Construction - La Cañada Flintridge, CA

The Chevy Chase project ran the full arc of ground-up work: the existing structure came down, and a new two-story residence went up in its place, 3,307 square feet on the first floor, 1,482 on the second, with a 440-square-foot attached garage. One build team carried it from demolition through permitting, construction, and finish work, with cabinetry by Spazietto and Caesarstone countertops.

Scope

Category
Ground-up new construction
First floor
3,307 sq ft
Second floor
1,482 sq ft
Attached garage
440 sq ft
Cabinetry
Spazietto
Countertops
Caesarstone

Result

Project Gallery

Chevy Chase new construction, structural framing in progress, La Cañada Flintridge
Chevy Chase new construction, two-story framing from the street, materials staged, La Cañada Flintridge
Chevy Chase new construction, framing the new structure on site, La Cañada Flintridge
Chevy Chase new construction, floor and wall framing inside the new structure, La Cañada Flintridge
Chevy Chase new construction, interior wall framing in progress, La Cañada Flintridge
Chevy Chase new construction, roof framing under weather protection, La Cañada Flintridge
Chevy Chase new construction, finished front exterior of the completed custom home, La Cañada Flintridge
Chevy Chase new construction, finished front entry with wood door, La Cañada Flintridge
Chevy Chase new construction, finished bathroom with double vanity and copper fixtures, La Cañada Flintridge
Chevy Chase new construction, finished primary bath with freestanding tub and glass block windows, La Cañada Flintridge
Chevy Chase new construction, finished study behind glass sliding doors, La Cañada Flintridge
Chevy Chase new construction, finished built-in closet with wood slat doors, La Cañada Flintridge

Approach

Ground-up work is where one licensed contractor earns its keep. The team that priced the structure ran the site: demolition, foundation, framing, systems, and the finish package all moved on one schedule under one contract. The cabinetry and counters weren't an afterthought bid out at the end - Spazietto and Caesarstone were in the plans from the start, so what was specified is what was installed.

In Construction

The build, as it happened.

Documented on site during construction, the work between the drawings and the finished rooms.

The original single-story home on the lot before demolition began at PMK Development's new-construction project in La Cañada Flintridge.
Original residence before demolition
First-floor walls stripped to exposed studs during demolition at PMK Development's ground-up construction project in La Cañada Flintridge.
Demolition down to studs
The two-story wood framing skeleton of the new home taking shape at PMK Development's new-construction project in La Cañada Flintridge.
Second-story framing rises
Engineered structural beams spanning the open interior framing at PMK's new-construction home in La Cañada Flintridge.
Engineered beams overhead
Crew members framing the new entry roof structure on scaffolding at PMK Development's La Cañada Flintridge new build.
Framing the entry roof
Wall and roof insulation installed throughout the interior, with skylight wells framed, at PMK's new-construction project in La Cañada Flintridge.
Insulation and skylights in
Weather barrier and stucco lath wrapping the exterior with drywall staged for delivery at PMK Development's La Cañada Flintridge new construction.
Weather barrier and lath
Finished drywall in the main living space with the linear fireplace opening framed in, at PMK's new-construction home in La Cañada Flintridge.
Drywall and linear fireplace
Smooth-coat stucco exterior with black-framed windows and new tile roofline at PMK Development's new-construction project in La Cañada Flintridge.
Smooth stucco and tile roof
Wood-look garage doors and triangular gable glazing installed on the detached garage at PMK's La Cañada Flintridge new build.
Modern garage doors installed
Concrete walkway forms and rebar grid laid out around the home at PMK Development's new-construction project in La Cañada Flintridge.
Walkway forms and rebar
The stuccoed ADU and rear courtyard flatwork coming together behind the main house at PMK Development's La Cañada Flintridge project.
ADU and rear courtyard

Chevy Chase, site documentation by the PMK crew