New construction / Altadena, CAUnder construction

Mt. Curve Avenue

From demolition to exterior stucco in the Altadena hills — grading, foundation, framing, and now interior finish, documented on site as the work happens.

Location
Altadena, CA
Spaces
Whole home
First framed walls rising from the deck at PMK Development's Mt. Curve Avenue project.
Wall framing goes up

Project gallery

The build so far, documented on site.

Photographed as the work happens - every caption states the actual construction stage, never finished proof.

Cleared yard with demolition underway behind the block wall at PMK Development's Mt. Curve Avenue project in Altadena.
Demolition begins
Crew grading and compacting the pad with the San Gabriel mountains behind, at PMK's Mt. Curve Avenue project.
Grading and compaction
Footing trenches dug across the compacted pad with a skid steer on site in Altadena.
Footing trenches dug
A PMK crew member setting foundation formwork at the Mt. Curve Avenue project in Altadena.
Foundation forms set
Poured block stem walls and decked subfloor with framing lumber staged on site in Altadena.
Foundation in, subfloor decked
Framed interior with sheathed roof structure and window openings at the Mt. Curve Avenue build.
Framing complete, roof structure in
Drywall hung with a rolling scaffold in the vaulted interior at PMK's Altadena project.
Insulation and drywall
Fresh exterior stucco on the finished structure at PMK Development's Mt. Curve Avenue project in Altadena.
Exterior stucco
Freshly painted vaulted interior with recessed lighting and a new mini-split at PMK Development's Mt. Curve Avenue project in Altadena.
Interior paint and finish underway

Rebuilding in Altadena

Rebuilding after the Eaton Fire? Here is how the process works.

Like-for-like rules, County One-Stop permits, published $380–425/sf pricing, and the two homes we are building in Altadena right now.

Altadena rebuild guide
CSLB #1008209 Licensed★ 5.0 on GoogleFounded 2015, 300+ projectsGreater L.A. + O.C.

From blueprint to built reality, starting with a conversation.

Tell us what you're planning. Two minutes, no pressure.